On the 26th of December in Kamyanka-Dniprovs’ka town of Zaporizhzhya region there was a solemn ceremony of the beginning of construction of new transshipment terminal for grains and oilseeds for river transport of “NIBULON”. The total area of the new branch is 8.6 hectares, grain storage capacity is 75.6 thousand tons. Daily capacity of dryers will comprise 4 thousand tons, and power upon the shipment of water transport is 5 thousand tons. 60 workers will provide the successful work of the elevator. Construction is scheduled for completion in mid-April 2010. As you can see, the construction of the terminal has been started recently, and even on the eve of holidays. But all this time (while the country was having a rest) works were not stopped. Thus in such a short period of time a lot of work has been done. You can reassure yourself, looking at photos on the status of the construction sector. Photo-report of the status of the construction of river terminal