The second T410 project harbor pusher tug (order 10034)The vessel has been launched. The shipbuilders are conducting outfitting works. When the specialists perform mooring and sea trials, the tug will be delivered to a customer. The fourth non-self-propelled B1500 project open type vessel (order 10038)The vessel is equipped with the coamings of the cargo platform and railing. The specialists have mounted pipes for the firefighting and drainage systems as well as all the electric and fitter equipment. The shipbuilders have performed water tightness tests of all the spaces. Thus, the workers are now painting buoyancy compartments and the vessel’s outer casing. The fifth non-self-propelled NBL-91 project vessel (order 10040)The workers at the metal processing workshop have prepared metal to produce the vessel’s sections. The assembly fabrication workshop continues to form sections. The specialists are currently working on three units simultaneously. The specialists have already moved the first four units to the building berth to start forming a cylindrical section of the hull structure. The fourth modernized 121M project tug (order 10044)The thirty sections have been already moved to the building berth. The shipbuilders have already installed the afterbody and the first unit of the superstructure. At present the hull structure is formed by 50%, thus the shipbuilders continue to mount the order efficiently.Having successfully performed mooring trials, the shipbuilders put the third non-self-propelled B1500 project open type vessel (order 10037) into operation and delivered to NIBULON’s shipping company. Currently, NIBULON’s fleet numbers 79 modern vessels of different classes and types.