In June 26, 2007 it’s expected the ceremonial putting into operation of the second (last) stage of the complex “Station of Receiving and Shipping of Grain” of “NIBULON Ltd” “Reshetilovskiy” branch. The representatives of the company will sum up the construction. It’s known previously that as a result of finishing of the construction of the second stage the volume of grain storage rose on 27,5 thousand tons, thanks to that the total capacity of the elevator will allow storing in it about 40 thousand tons of grain at one time. During the construction there were built railway-weight and shunting device. The existent office block was reconstructed as well as the area was planted and equipped with modern services and utilities. On the occasion of putting into operation there will be the festal ceremony and ceremonial handing of a symbolic key. And there will be no ceremony without surprises.
The ceremony of opening will be one of the stages of the regional scientific-practical conference of harvesting and preparation to sowing of winter crops which is organized by Poltava Regional State Administration.