At present, the contractors have mounted the elevator tower metalwork, the last four of the eight silos of 500 tons each, airy galleries, a truck tipper with dump pits as well as hoppers with a control room to load on railway transport. The contractors have already mounted truck scales produced by Bulat, NIBULON’s constant partner, and its shed.
The specialists have constructed waste product hoppers and mounted conveying grain transshipment equipment produced by Elevator Equipment Plant Ltd. (Odesa), as well as a pressure pipeline.
The specialists from Energobudmontazh Ltd have laid electrical supply cabling outside and inside and illuminated the future facility site.
The specialists will soon finish pre-commissioning work and equipment testing. The workers finish painting self-flowing pipes and elevator tower metalwork. The specialists complete landscaping the territory, creating green spaces.
We would remind you that NIBULON is constructing in Khmilnyk the third filling station of 375 cubic meters to serve its own fuel needs. The first two filling stations successfully operate at Kremenchutska branch (Poltava region) and Svativska branch (Luhansk region), thereby enabling the company to halve the terms of oil product delivery to the respective regions.